High Plains Open Energy Data

Wyoming electricity generation, 2025

Dataset as of 16 November 2026. Covers generators located in Wyoming as reported to EIA for 2025, the most recent year of final data.

Summary by fuel

FuelGeneratorsCapacity (MW)Share of capacity2025 net generation (TWh)Share of generation
Coal255,530.243.4%26.3657.8%
Wind334,707.437.0%12.7327.9%
Natural gas331,933.515.2%5.0311.0%
Hydro32303.42.4%0.831.8%
Solar2242.01.9%0.501.1%
Other (incl. batteries)313.30.1%0.090.2%
Oil45.80.0%0.050.1%
Total13212,735.6100%45.58100%

Coal provided about 58% of Wyoming's 2025 generation from 43% of its capacity; wind provided about 28% from 37%.

Where it goes: generation and in-state sales, 2001 to 2025

Comparing the electricity generated in Wyoming with the electricity sold to retail customers in Wyoming gives a rough measure of how much leaves the state. In 2025, 62% of Wyoming's net generation was not sold to Wyoming customers. The share has drifted down from about 71% in 2001, mainly because in-state sales grew while generation stayed roughly level.

YearNet generation (TWh)In-state retail sales (TWh)Not sold in Wyoming
200144.812.971%
200545.614.169%
201048.117.164%
201549.016.965%
202042.015.364%
202440.717.258%
202545.617.362%

This is a net, approximate figure. It does not account for transmission and distribution losses, for electricity imported into Wyoming, or for which plants serve which customers. Delivery-only sales are excluded, because the same energy also appears as an energy sale; in Wyoming all reported sales are bundled, so this makes no difference here.

Downloads

Sources

Checks

Every build compares the PUDL figures with the EIA-860 workbook itself. For 2025:

Notes and limitations

Reproduce it

Run python scripts/build_wyoming_data.py, python scripts/build_retirement_history.py and python scripts/build_wyoming_queue.py --lbnl path/to/LBNL_Ix_Queue_Data_File_thru2025.xlsx from the repository. Add --eia860 path/to/3_1_Generator_Y2025.xlsx to the first, and --verify 2025=path/to/3_1_Generator_Y2025.xlsx to the second, to repeat the cross-checks against EIA's release.

The datasets built from PUDL are rebuilt automatically when PUDL publishes a new release, and are published only if every check passes. Current PUDL release: published 10 November 2026.

Licence and attribution

CC-BY-4.0. Please cite as: High Plains Open Energy Data (2026), Wyoming electricity generation, 2025, derived from the Public Utility Data Liberation project (Catalyst Cooperative) and U.S. EIA Form 860 and 923 data.